In the past Hutní montáže participated in construction of almost all coal firing power plants (Tušimice I and II, Počerady, Mělník, Chvaletice) and nuclear power plants (Jaslovské Bohunice, Dukovany, Mochovce, Temelín) in the former Czechoslovak Republic. (As regards the coal firing power plants these projects included construction of supporting structural steel and equipment installation, while as regards the nuclear power plants Hutní montáže delivered and constructed supporting structural steel and safety containment.)

In the eighties and nineties Hutní montáže participated in the air protection projects in the power generation sector aimed at flue gas desulphurization of the biggest Czech and Slovak power plants - mostly as partner of foreign companies which brought their know-how, i.e. technology and basic design into this area.

Hutní montáže became a dominant contractor in the area of new fluidized bed boiler installation (Tisová PP, Poříčí PP, Ledvice PP, Zlín PP, Hodonín PP). When carrying out these projects our company cooperated with renowned suppliers of power equipment.

Hutní montáže carry out o­n a continuous basis the overhauls, medium-large repairs and regular repairs of boilers, steam duct burners and other equipment, particularly in Dětmarovice, Tušimice, Prunéřov, Počerady and power plants, Kladno Power Centre and others.

Hutní montáže performs complex installation of energy recovery and paper boilers, installation of pressure and non-pressure boiler parts, including annealing, NDT, pressure testing, technology, welding, storage, lifting procedures, and scaffolding.

Today Hutní montáže operates in this sector not only in the domestic market, but also in many European countries (Germany, Sweden, Finland, Estonia, Slovakia, Bulgaria, the Netherlands, Denmark), recently in Uruguay and South Africa, and cooperates successfully and on a long-term basis with leading engineering and construction firms, such as Foster Wheeler, Mitsubishi-Hitachi, Alstom, Andritz, Valmet and others.

References

50-DSC05006.jpg
Project name: CYMIC biomass boiler, Copenhagen, Denmark
Realization: 01/2017 - 03/2019
Subject: Installation of fluid boiler technology (500 MW)
Purchaser: VALMET TECHNOLOGIES
Note: Installation of of technological equipment for pressure components, pipes and ducts ( total 6,880 tons) under construction
Gallery  
56-steti1.jpg
Project name: Paper Mill, Mondi Štětí
Realization: 08/2017 - 10/2018
Subject: Installation of recovery boiler 2800 tds/d
Purchaser: VALMET TECHNOLOGIES
Note: Installation of boiler pressure part, internal and external piping, air and smoke channels, other technological equipment and electrostatic filters. (total 5,358 tons) . . under construction
Gallery  
62-7.-Power-station-Unit-1-800-MW-Kusile-RSA.JPG
Project name: Power Station, Kusile, Republic of South Africa
Realization: 08/2013 - 02/2018
Subject: Installation of five supercritical boilers á 800 MW
Purchaser: Mitsubishi-Hitachi Power Systems Africa
Note:
Gallery  
91-Timra.jpg
Project name: Paper Mill SCA Östrand, Timrå, Švédsko
Realization: 08/2017 - 05/2018
Subject: Installation of flue gas cleaning - Recovery Boiler, 3300/4400 tds/d production capacity expansion
Purchaser: Andritz
Note: Installation of electrostatic filter, smoke ventilator and flue gas cooler including strucural steel construction, installation of new smoke channels incl. disassembly and modification of existing smoke channels. (total 1,146 tons)
Gallery  
99-8.-montaz-parniho-bubnu.JPG
Project name: Power Station, Devnya, Bulgaria
Realization: 10/2015 - 09/2016
Subject: Installation of CFB boiler 185 MWth and related technological equipment
Purchaser: Foster Wheeler Energia, Polska
Note: Construction of supporting structure - see references in sector Industrial, sports and other buildings
Gallery  
105-Ravoka-6.jpg
Project name: RAVOKA ProjectRaahe, Finland
Realization: 02/2015 – 02/2016
Subject: Installation of Blast Gas Power Boiler (Boiler Island) 141 MWt
Purchaser: VALMET TECHNOLOGIES
Note:
Gallery  
113-EDE-DENOX-2014-13-.JPG
Project name: Power plant ecologization (Denox), ČEZ Dětmarovice
Realization: 04/2014 - 11/2014
Subject: Installation of DENOX technolgy of boiler K3, K4
Purchaser: VÍTKOVICE POWER ENGINEERING
Note:
Gallery  
120-Regeneracni-kotel-Ruzomberok.jpg
Project name: Recovery boiler, Mondi SCP, Ružomberok, Slovakia
Realization: 11/2013 - 09/2014
Subject: Installation of boiler, filter and process pipes
Purchaser: Andritz OY
Note:
Gallery  
121-ELKV-lund-.article.jpg
Project name: Heating Plant, Lund, Sweden
Realization: 01/2013 - 11/2013
Subject: Installation of technological equipment of CFB biomass boiler 110 MWth
Purchaser: Foster Wheeler Energia
Note: Installation of boiler pressure part, internal piping, boiler structure (hanger rods, buckstays, etc.), air and flue gas system, material handling and burners BOP (main steam, feed water), total weight: 1,685 tons
Gallery  
127-Montaz-kotle-Lapenranta.jpg
Project name: Biomass Boiler CFB, Lappeenranta, Finland
Realization: 08/2008 - 07/2009
Subject: Installation of pressure and non-pressure parts of 360 MW Boiler
Purchaser: Foster Wheeler Energia
Note: Installation of boiler pressure part, boiler internal piping, boiler structure (hanger rods, buckstays, etc.), boiler air and flue gas system, material handling and burners BOP (main steam, feed water), total weight: 5,071 tons
Gallery  
132-P1010433.JPG
Project name: Biomass Boiler CFB IKV Panna, Södertälje, Sweden
Realization: 08/2008 - 7/2009
Subject: Delivery of Boiler erection (240 MW, 90 bar, 540 oC)
Purchaser: Foster Wheeler Energi
Note: Installation of boiler pressure part, boiler internal piping, boiler structure (hanger rods, buckstays, etc.), boiler air and flue gas system material handling and burners BOP (main steam, feed water) total weight: 3,704 tons
Gallery  
138-Walsum111.jpg
Project name: Power plant, Block 10, Duisburg-Walsum
Realization: 10/2007 - 09/2009
Subject: Installation of pressure parts of supercritical boiler 700 MW
Purchaser: Hitachi Power Europe
Note:
Gallery  
154-GOPR0290-1492185689943-high-.jpg
Project name: Recovery boiler 7200 tds/d, Aänekoski, Finland
Realization: 11/2015 - 10/2017
Subject: Installation of technological equipment of boiler 7200 tds/d
Purchaser: Metsä Fibre
Note: Pressure parts, internal and external pipingair ducts and hoppers, primary and secondary supports, valves, other equipment (total 10,047 tons)
Gallery  
165-Zapaleni-regeneracniho-kotle-18.11.2013-Uruguay.JPG
Project name: Papírna, Punta Pereira, Uruguay
Realization: 04/2012 - 11/2013
Subject: Montáž technologie regeneračního a energetického kotle
Purchaser: Andritz
Note:
Gallery  
171-Kladno-.jpg
Project name: Elektrárna Kladno
Realization: 03/2012 - 06/2013
Subject: Montáž technologického zařízení kotle 100 MW
Purchaser: Foster Wheeler Energi
Note:
Gallery  
178-Elektrarna-Moorburg-7483.jpg
Project name: Elektrárna Moorburg, Německo
Realization: 11/2011 - 08/2012
Subject: Montáž membránových spirálových stěn kotle
Purchaser: Hitachi Power Europe
Note:
Gallery  
180-Kotel-800-MW-Rottrdam-.JPG
Project name: Nadkritický kotel Rotterdam-Maasvlakte, Nizozemí
Realization: 08/2010 - 06/2013
Subject: Montáž technologie kotle CFPP 800 MW
Purchaser: Hitachi Power Europe
Note:
Gallery  
185-wilhelmsahven.JPG
Project name: Nadkritický kotel, Wilhelmshaven, Německo
Realization: I. 09/2009 - 2012 II. 01/2012 - 03/2013
Subject: I. Montáž technologie kotle 800 MW, II. Zpětná montáž kotle
Purchaser: Hitachi Power Europe
Note:
Gallery  
189-tusimice-druha-etapa-10-.jpg
Project name: Komplexní rekonstrukce ETU II - I. etapa a II. etapa
Realization: I. 09/2007 – 10/2008, II. 10/2009 - 07/2011
Subject: Demontáž a montáž celkem čtyř kotlů ve dvou etapách
Purchaser: VÍTKOVICE HEAVY MACHINERY, VÍTKOVICE POWER ENGINEERING
Note:
Gallery  
82-1.jpg
Project name: Regenerační kotel, Obbola, Švédsko
Realization: 09/2006 - 08/2007
Subject: Montáž regeneračního kotle
Purchaser: Andritz
Note:
Gallery  
73-1.jpg
Project name: Regenerační kotel, Fray Bentos, Uruguay
Realization: 02/2006 - 07/2007
Subject: Montáž technologie kotle a nosné ocelové konstrukce kotle 4450 tds/d
Purchaser: Andritz, Botnia, Uruguay
Note: