Metallurgical works

In the past Hutní montáže participated in construction of major metallurgical plants in the Czech Republic and Slovak Republic, therefore it is legitimate that the experiences are used in the repair works and in installation of new metallurgical equipment. Our company works currently for Třinecké železárny iron works (Moravia Steel), ArcelorMittal Ostrava (former Nová huť Ostrava), Blast furnaces Ostrava and VÍTKOVICE.

In the past few years we have participated gradually in blast furnace, steelwork, hot blast stove, sintering plant, lime supply system, rolling mill, cutting line and conveyor, flue gas duct, piping system and pipe and cable bridge repair works and maintenance of many other metallurgical facilities. The works carried out consisted of overhauls, medium-large and regular repairs. Hutní montáže continuously and o­n long term basis provides general decade repairs within metallurgical plants listed above.

Hutní montáže has executed a series of dismantling works– dismantling of actual equipment precedes the overhauls.

Running works in metallurgical plants, as e.g.:

- Dismantling, general and medium overhaul of the blast furnace, the hot-blast stove and the sintering plant and its
  maintenance
- Refurbishment of the annealing furnace and the cutting line
- Gas supply ducts (DN 3000, DN 2700, DN 500)
- Refurbishment of the lime metering line – sintering plant, and the belt conveyor bridge
- Gas piping installation, exhaust system from the sintering conveyor and rotating silo and other works


References

506-VP-6-ohrivac-vetru-Kalugin-TZ-Trinec-3-.jpg
Project name: Blast furnace No. 6 - TŽ Třinec
Realization: 06/2017 - 09/2017
Subject: Installation of Hot-blast recuperator Kalugin
Purchaser: BKB Metal
Note:
Gallery  
508-P1011001.jpg
Project name: Casting machine, ArcelorMittal Ostrava
Realization: 04/2017 - 06/2017
Subject: Reconstruction of the casting machine
Purchaser: ArcelorMittal Ostrava
Note:
Gallery  
515-Montaz-prasniku-33-.JPG
Project name: Repairs of blast furnace No. 4 - TŽ Třinec
Realization: 05/2017 - 11/2017
Subject: Repair of Dust Collector and gas pipeline of VP4
Purchaser: TŽ Třinec
Note:
Gallery  
526-IMG-4127.JPG
Project name: Repairs of the blast furnace No. 6, TŽ Třinec
Realization: 05/2013 - 10/2013
Subject: Repairs of the blast furnace No. 6
Purchaser: TŽ Třinec
Note:
Gallery  
530-AMO-VP.jpg
Project name: Refurbishment of the cooling of the blast furnace, ArcelorMittal Ostrava
Realization: 02/2012 - 06/2012
Subject: Exchange of coolers
Purchaser: ArcelorMittal Ostrava
Note:
Gallery  
536-IMG-00-22.jpg
Project name: Quick forging machine, VÍTKOVICE HAMMERING
Realization: 06/2011 - 07/2011
Subject: Installaion of hydraulics equipment of the forging machine
Purchaser: VÍTKOVICE POWER ENGINEERING
Note:
Gallery  
545-go-vp-3-ArcelorMittal-Ostrava.jpg
Project name: Blast furnace No. 3, ArcelorMittal Ostrava
Realization: 11/2008 - 12/2010 (interruption of repair: 03 -10/2009)
Subject: General overhaul of the blast furnace
Purchaser: ArcelorMittal Ostrava, VÍTKOVICE HEAVY MACHINERY
Note:
Gallery