Bridges

Construction of steel bridges belongs since the foundation of Hutní montáže to the traditional and basic sectors of its construction activities. Hutní montáže participated in construction of all large steel bridges in the Czech and Slovak Republic. Over its fifty-years-long history Hutní montáže played a dominant role in this area; till the early nineties in fact almost all large steel bridges in the Czech and Slovak Republic were constructed exclusively by Hutní montáže.

Some of the projects of that time in the Czech Republic are: Žďákov Bridge across the Orlická Dam, bridges o­n D1 highway near Humpolec and Velké Meziříčí, Barikádníků Bridge or bridge over the Masaryk railway station in Prague. In Slovak Republic these were mainly the bridges in Bratislava - cabel New Bridge with in-pylon-restaurant, railway and highway quay-Bridge or the reconstruction of Old Bridge (Red Army Bridge). Followed by construction of following bridges: road bridge in Kiel and reconstruction of railway bridge at Rendsburg in Germany, the Mariánský Bridge in Ústí nad Labem and the Long Bridge in České Budějovice.

Please, find below the list of most important bridge construction projects built over the past 15 years:


Hutní montáže construct:

 - railway, road and highway,
 - steel and composite,
 - lattice,arc, cable, suspended bridges, 


Using various technologies for construction of bridges, such as:

 - classic construction method,
 - free cantilever construction,
 - launching,
 - classic flooding or special pivoting by turning upon ships (see the Apollo Bridge)


References

Project name: The bridge on D1 motorway- modernization of section 4 - Ostředek
Realization: 06/2018 - 07/2018
Subject: Structural steel construction of the bridge
Purchaser: Metrostav
Note: Under construction
Gallery  
Project name: The bridge Mladé Buky
Realization: 07/2018 erection, 10/2018 dismantling of temporary supports
Subject: Delivery and construction o structural steel of the bridge
Purchaser: ALPINE Bau CZ
Note: Under construction
Gallery  
Project name: The Waltershof Bridge, Hamburg, Germany
Realization: 06/2018 - 09/2018
Subject: Structural steel construction of the bridge (weight 520 tons)
Purchaser: ZSB Zwickauer Sonderstahlbau
Note: Under construction
Gallery  
201-DSC00188.JPG
Project name: Highway access road - highway A46, Bermecke, Germany
Realization: 07/2015 - 06/2018
Subject: Construction of structural steel of the bridge
Purchaser: Plauen Stahl Technologie
Note: Total length of the bridge: 625 m, arch radius: 1500 m, elevation: 26 m, maximum height above ground: 49 m, number of section: 2x 49,5 m and 8x 65,7 m, weight of the heaviest part: 98 tons. Total weight of steel structure: 3375 tons
Gallery  
213-stary-most-Bratislava-1-.JPG
Project name: Old Bridge (Starý most), Bratislava, Slovakia
Realization: 11/2014 - 11/2015
Subject: Dismantling and construction of structural steel of new bridge
Purchaser: EUROVIA CS
Note: Total length of the bridge 462 m, width: 22.1 m (max. 33.1 m), construction height: 11.3 m, total weight of steel structure: 5650 tons.
Gallery  
225-Rudna-.jpg
Project name: The road bridge - Prodloužená Rudná, Ostrava
Realization: 07/2014 - 07/2016
Subject: Construction ov structural steel of two bridges
Purchaser: OHL ŽS
Note: Total weight of steel structure: 3600 tons, total length 479 m
Gallery  
235-1.JPG
Project name: The motorway bridge Minnesund, Norway
Realization: 05/2010 - 04/2011
Subject: Delivery and construction of structural steel of the bridge extension
Purchaser: NCC Construction
Note:
Gallery  
241-Most-na-D1-Jablonov-Studenec-Slovensko.JPG
Project name: Bridges on the motorway D1 Jablonov-Studenc, Slovakia
Realization: I.stage 09/2009 - 03/2010 II.stage 08/2011 - 12/2011
Subject: Construction and surface protection of the steel structure of the bridges
Purchaser: Ingsteel, Bratislava
Note: Total length 500 m, total weight ca. 2 x 2000 tons
Gallery  
315-studenka-8.jpg
Project name: The road bridge over railway, Studénka
Realization: 02/2009 - 03/2009
Subject: Construction of structural steel of the bridge
Purchaser: ODS Dopravní stavby Ostrava
Note:
Gallery  
309-1.JPG
Project name: Motorway bridges Murckowska, Poland
Realization: 03/2008 - 11/2008
Subject: Construction of structural steel of two bridges
Purchaser: VÍTKOVICE POWER ENGINEERING
Note: Total weight 1310 tons, length 63 m.
Gallery  
302-D1-Mengusovce-Janovce2.jpg
Project name: Motorway bridges on D1, Mengusovce-Jánovce near Poprad
Realization: 11/2006 – 10/2008
Subject: Derlivery ane construction of structural steel of bridges
Purchaser: Inžinierske stavby, Košice
Note: Two separate bridges with 11 (10) sections, length 280 (254) m. section span 26 m. Total weight 1400 tons.
Gallery  
296-Most-obchvat-Jablunkova-2007.JPG
Project name: Road bridges, Jablunkov bypass
Realization: 10/2006 – 09/2009
Subject: Construction of structural steel of four bridges (over river Olše, Černý and Jasení brooks and waley estacade)
Purchaser: VÍTKOVICE HEAVY MACHINERY
Note:
Gallery  
287-P9180008.JPG
Project name: Bělotín bypass on road the R 48
Realization: 11/2004 – 10/2006
Subject: Delivery and construction of the bridge structural steel
Purchaser: Skanska DS
Note: Total length of the bridge 582 m, total weight 2300 tun, nubmer of sections 14
Gallery  
274-Foto-1-Odra.JPG
Project name: Bridges o­n the D 47 motorway
Realization: I.stage 09/2001 – 03/2003, II.stage 10/2004 – 05/2006, III.stage 10/2004 – 02/2006, IV.stage 04/2005 – 02/2006, V.stage 10/2005 – 05/2006, VI.stage 09/2007 - 11/2007
Subject: Structural steel construction of six bridges
Purchaser: ODS Ostrava, Skanska DS
Note:
Gallery  
266-Apollo-bridge-Bratislava-Slovakia.jpg
Project name: The road bridge Apollo (Košická), Bratislava, Slovakia
Realization: 08/2003 – 08/2005
Subject: Construction of the steel structure of the bridge using a unique technology turning on the river,
Purchaser: MCE Vest, Linz
Note: Weight of the bridge structure: 5200 tons, main arc length: 231 m, total leght: 517 m, width: 32 m
Gallery  
251-Svinesund4.jpg
Project name: The motorway bridge Svinesund on the Gothenburg - Oslo route, Sweden - Norway
Realization: 07/2003 – 06/2005
Subject: Construction of the bridge structural steel
Purchaser: Brückenbau (PST) Plauen
Note:
Gallery  
210-Snimek-033-kopie.jpg
Project name: The footbridge over the Brno dam
Realization: 06/2003 – 07/2003
Subject: Construction of thel bridge structural steel
Purchaser: Firesta, Brno
Note:
Gallery